The concrete bucket is equipped with bottom and helix made of wear resistant steel HB400, fixed safety rounded grill with bag breaker, electric valve, hydraulic hoses, electric connection kit, hydraulic opening of the bottom through a cylinder with covered rod and unloading pipe.
The OPT-02-022 “Double Hydraulic Output at the Boom Head”, required to use the clamp, must be ordered separately.